Issue Reported

The sliding gate at Sims Green Condominium required a full track and drive system renewal, including replacement of the floor metal track, gear track, and rollers, together with installation of new entrance and exit motor systems to restore reliable automated gate operation.

Site Findings

On-site inspection confirmed the existing floor track, gear track, and rollers were worn and the entrance and exit motor systems required replacement. Ground preparation was needed to anchor the new motor housings, and the gate frame required grinding and refitting to suit the new track and drive components.

Job Scope

  • Remove existing floor metal track, gear track, and worn rollers
  • Supply and install new metal floor track
  • Supply and install new gear track along the sliding gate
  • Replace rollers with new roller set
  • Prepare concrete base and anchor studs for entrance and exit motor housings
  • Supply and install entrance and exit motor systems
  • Terminate electrical wiring at motor control enclosures
  • Test gate open/close operation and safety functions

Work Performed

  • Removed worn floor track, gear track, and rollers from the sliding gate
  • Installed a new metal floor track aligned to the gate travel path
  • Fitted a new gear track along the sliding gate frame
  • Replaced the roller set to restore smooth gate travel
  • Prepared the concrete base with anchor studs for the motor housings
  • Installed and wired the entrance and exit motor systems
  • Ground and refitted gate frame components as required
  • Conducted operational and safety testing of the gate

Materials Replaced

  • Metal Floor Track
  • Gear Track
  • Roller Set
  • Entrance Motor System
  • Exit Motor System
  • Motor Housing Anchor Studs & Concrete Base

Result

The new metal floor track, gear track, rollers, and entrance/exit motor systems were successfully installed and tested. The sliding gate now operates smoothly under automated control with reliable entry and exit motor operation.

Recommendation

Schedule regular preventive maintenance for the track, gear track, rollers, and motor systems to extend the lifespan of the gate and prevent unexpected failures.

Technician Notes

New floor track, gear track, and rollers installed. Entrance and exit motor housings anchored to prepared concrete base and wired. Gate operation verified with QC check on site.